While the machines were on site, the trench for the well line was dug and Ken Newson and I installed the well pump and water/electric lines back into the basement.
Wednesday, September 26, 2007
Backfill and Well Pump
While the machines were on site, the trench for the well line was dug and Ken Newson and I installed the well pump and water/electric lines back into the basement.
Subscribe to:
Post Comments (Atom)
1 comment:
Looks cool Jeff
Post a Comment