Tuesday, June 5, 2007

Moving the Cabin

Well you will notice the last week went by without anything further to update. That changed yesterday and today with the cabin finally getting shifted to the north about 30 ft.


Monday the crew arrived and they attached vertical microlam (thick plywood) to the exterior to hold the logs together and keep them from sagging or separating during the lift and move.

On the interior they attached very deep microlam beams all around about half way up the walls. These are what the steel beams would lift and thus raise the log cabin off the old foundation. The lift and move in the next posting.
Posted by Heather at 7:30 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2008 (6)
    • ►  February (4)
    • ►  January (2)
  • ▼  2007 (21)
    • ►  November (3)
    • ►  October (1)
    • ►  September (5)
    • ►  August (2)
    • ►  July (1)
    • ▼  June (5)
      • Cottage Addition Moved from Site
      • Log Cabin
      • End of Day
      • The Lift and Move
      • Moving the Cabin
    • ►  May (4)
 

The clearing

The clearing

Drilling the well

Drilling the well

The Fleming Crew

The Fleming Crew

Chimney & Fireplace Demo

Chimney & Fireplace Demo
Murray Leadbeater

Bunkie has wings

Bunkie has wings
Jim Tedford with the help of Drain Bros backhoe

Ready for concrete

Ready for concrete
Heather & Jeff where log cabin will be relocated