Wednesday, January 16, 2008

Drywall





The main floor has been drywalled and the taping started this week. Next week we will be painting. In the basement, Murray, his son Ian and Steve, have finished all partitions and outside wall framing and sound attenuation. The electrical rough-in is done, and insulation will be starting on perimeter walls prior to drywall installation.

Photos are the main floor bedroom, living room, kitchen and dining looking through to the screen porch and the last is from the entrance looking through the living room to the lake. The opening in the hall to living room wall is for our stained glass window from Conger St.

No comments: