



December saw the septic system installed and the grading raised as well as the new driveway installed. This changed the look of the site and brought the scale of the house and detached garage down. In the spring the grades will be topped off as the final landscaping is completed.
You will notice the snow on the roof as winter arrived and
interrupted all those other outdoor jobs such as painting trim and stone
veneer on the lower portions of some walls and the base of the
verandah posts. You will just have to visualize the "canyon clay" colour trim and the "Bucks County Country
Ledgerock" stone facing
on the post bases and where the white
tyvek is exposed. Spring will arrive soon enough for these to be completed.