Saturday, November 17, 2007

The Garage



Murray & Steve got the footings poured and Glen Payne and his crew installed the concrete block. Then Drains stone slinger filled the inside to where the concrete floor will be poured. Next was the frame, roof and door frames. Just waiting for the floor to be poured now so the garage can be completed. Then backfill and grading can be finished around both the house and garage.

No comments: